Investment cost
Investment Costs(投资成本)

Total energy supply capacity of public utilities

Water cost

 

Residential water                                                 1.9-3.8 Yuan/m3

Industrial water                                                    2.25 Yuan/m3

Water for commerce, service industry and construction industry              2.95Yuan/m3

Water for profit-making car washing, dancing hall, night club, sauna, and foreign steamer   7.5Yuan/m3

* Sewage treatment charge standard:

Residential sewage             0.95 Yuan/m3

Public facilities and Industries sewage                1.05 Yuan/m3

Commerce industry sewage       1.15 Yuan/m3

Sewage of profit-making car washing, dancing hall, night club, sauna, and foreign steamer

2.5 Yuan/m3

 

Electricity cost

                                                             Unit: Yuan/KWH

 

Normal demand

 

High demand (101 – 3000KVA)

 

Ultra High demand (>3001KVA)

Electricity for residents and agriculture

0.68

 

 

Electricity for commerce     and service industry

0.87

0.73-0.77

0.68-0.72

Electricity for industries (including some logistics industries)

0.70

0.35-0.71

0.30-0.66

 

LPG cost

Residential gas                                                  10.90 Yuan/m3

Commercial gas                                                  14.20 Yuan/m3

 

Communications cost

 1) Local calling network communications rates

Basic monthly line rental for non-residential users:

35 Yuan / month / set

Local call rate

Inside business district

0.22Yuan for the first 3 minutes, and 0.11Yuan / minute since the fourth minute

Outside business district

0.2 Yuan/ time (one minute a time)

Long-distance call rate:

Domestic                         

0.07 Yuan/6 seconds

International                        

0.8 Yuan/6 seconds

Hong Kong, Macao, and Taiwan

0.2 Yuan/6 seconds

2) Mobile communications rates

Basic monthly line rental: 50 Yuan per user per month

Local call rate: 0.4 Yuan per minute

Long distance call rate: Basic local mobile call rate + Corresponding long distance call rate

 

3) Internet services

 

 

                                   

Subscriber’s ID setup and network installation                                   

charge                         Network access charge       Notes

(Yuan / subscriber)            (Yuan /subscriber /month)                                                  

ADSL virtual dialing

880                     630               Commercial user  

IP MAN (5M)

1000                    2800               Commercial user

ADSL virtual dialing

380                     200               Residential user

The above-mentioned communications charges are the basic ones stipulated by telecommunications companies, and the communications cost can be reduced by a big margin by employing the IP conversation mode or the preferential service packages designed by the telecommunications companies.

 

5. Price on assignment of land use right

                                     Unit: Yuan per square meter for building area

 

Nanshan

Futian

Luohu

Yantian

Longgang &Bao’an

  Commercial land

13183487

13575820

1299-7960

12302350

3802358

Office land

11932446

12402895

11933134

10881891

3601381

Residential land

6702003

753-2593

8282680

7051420

2811335

Industrial land

303720

348676

308700

366-556

186376

                       

The prices on the assignment of land use right listed above are for reference only, and the prices should be subject to negotiation with property owners or through bidding and tender.

 

Land price

Grand Industrial Area

Hi-Tech Industrial Park

Futian Free Trade Zone

Yantian Port Bonded Area

(222-236)× land type correction coefficient× floor area ratio (general industrial project)

130-170 (X floorage)

USD 120-200 / square metres (Land for industry and logistics), USD 260 / square metre (floorage) (Land for commerce and trade)

USD 285 / square metre (Land for logistics)

 

Rental of office building, factory building , and warehouse

 

Nanshan

Futian

Luohu

Yantian

Longgang

Bao’an

 Office building

High  building

2080

30120

35110

2565

860

Multilevel

1567

2550

1540

2070

560

Factory building

1260

15150

818

824

414

514

Warehouse

925

675 

675

818

410

515

 

 Payment for employees

Unit: RMB/person.month

 

High

Medium

Low

In SEZ

/

2112

842

Outside SEZ

/

1432

558

Average

/

2067

615

 

Insurance premium

 

 

 

Undertaken by enterprises

Undertaken by individuals

Notes

Social pension insurance

Basic social pension insurance

9%

5%

for  permanent resident

8%

5%

for  temporary resident

Basic medical insurance

comprehensive medical insurance

6.5%

2%

for  permanent resident

comprehensive medical insurance

6.5%

2%

for  temporary resident

In hospital medical insurance

1%

 

 

Industrial accident insurance

 

515%

 

Unemployment insurance

 

4%

 

public accumulation fund for housing construction

 

13%

 

Note: insurance is calculated on the basis of average monthly pay.

 

Industrial and commercial registration charge

The fees to be charged on registration should be 0.08% of the sum of the enterprises’ registered capital;  in case of registered capital exceeding 10 million Yuan, the exceeding amount shall be charged at 0.04%;; and   regarding registered capital exceeding 100 million Yuan, the portion of excess is free of charge.

 

Capital construction

The cost of capital construction for industrial premises is about 500-1000Yuan per square meter.

 

Cost of transportation

1.) Cargo keeping and service charges for customs warehouses

                                                  Unit of charging: per day

                         Indoor warehouse          outdoor warehouse

Common cargos         3.7 Yuan / m2 or1.5Yuan/ m3       0.8 Yuan / m2

Containers  20 feet      1500HKD/Time(HKFutian Free

Trade Zone);150HKD/Load and

upload                       25 Yuan / container

          40 feet&n